The 15-vendor problem most NCR homeowners face
In a typical Delhi NCR renovation, a homeowner ends up trying to coordinate:
- Carpenter for shutters and built-in furniture
- Modular kitchen vendor
- Wardrobe vendor (sometimes a separate company)
- Plumber for sinks, bathrooms, and water lines
- Electrician for points, switchboards, and lighting
- Painter for walls and false ceiling
- POP and false-ceiling team
- Tile / marble / countertop fabricator
- Hardware supplier
- uPVC or aluminium window vendor
- Glass and mirror supplier
- Appliance dealer
- Installer teams from multiple brands
- Delivery and lift coordination
- Society RWA for approvals
That is fifteen phone numbers, fifteen schedules, fifteen quality standards, and no single accountability when something goes wrong. The result: missed install dates, materials sitting on-site for weeks, electrical points landing in the wrong place, and the homeowner becoming an unwilling project manager.
What ARITSAN coordinates
- Design. Layout, mood, material direction, finish palette, lighting plan.
- Sourcing. Verified manufacturing partners for modular kitchen, wardrobes, profile windows, and curated appliances.
- Civil and trades. Carpenter, electrician, plumber, painter, false-ceiling team — scheduled in the right sequence.
- Material QC. Carcass grade at procurement, finish check before dispatch, snag closure on-site.
- Society coordination. NOCs, lift padding, work-hour rules, material entry, gate-pass paperwork.
- Timeline. Written schedule, weekly progress updates, named install windows.
Renovation scope by home type
| Scope | Typical inclusions | Timeline notes |
|---|---|---|
| 1BHK refresh | Investment-aware refresh — paint, lighting, modular kitchen, key storage upgrades. | Typically 4–6 weeks of active work. Most households can phase the work and stay through. |
| 2BHK partial or full | Kitchen + wardrobes + paint + electrical refresh. Often a builder-floor refresh. | 6–10 weeks. Civil scope determines whether to vacate. |
| 3BHK full renovation | Kitchen, wardrobes (multiple bedrooms), bathrooms, ceiling, electrical, windows, paint. | 10–16 weeks. Usually requires vacating for the active civil and install phase. |
| Villa or 4BHK premium | Full design-led renovation across all rooms, premium specification. | 12–20 weeks. ARITSAN provides a phased schedule with named install windows. |
Investment planning bands
We frame budget as a parameter band, not a fixed quote. The same renovation scope can sit at three different investment levels depending on finish, hardware, and material tier. For the kitchen and wardrobe components in detail, see modular kitchen cost in India and wardrobe design cost in India.
Why homeowners struggle with multi-vendor coordination
- No single accountability. When a problem appears, each vendor points at the other. Time and money leak between the cracks.
- Sequence mistakes. Wardrobes installed before electrical points are corrected. Tiling done before plumbing rough-in is finalised. Each mistake adds rework.
- Material mismatches. The handle brand the carpenter picked does not match the cabinetry handle from the modular vendor. Small mismatches accumulate.
- Schedule slippage. One delayed vendor cascades into a six-week timeline extension.
- Decision fatigue. Homeowners are asked to make hundreds of small decisions across different shops and showrooms, often with conflicting recommendations.
ARITSAN note
We coordinate; we do not manufacture or execute trades ourselves. That separation lets us choose the right verified partner for each stage rather than locking you into one vendor's inventory or preferred timeline.
Timeline expectations
- Design and approval. 2–4 weeks of design development, finish selection, and quote sign-off.
- Civil and electrical. 2–4 weeks depending on scope.
- Manufacturing. 3–4 weeks for kitchen and wardrobe builds in parallel with civil work.
- Installation. 1–3 weeks for modular install, painting, and finishing.
- Snag closure. 1 week of final checks, fitment adjustments, and handover.
Areas we serve
ARITSAN delivers renovations across South Delhi, South-West Delhi, Central Delhi, West Delhi, Dwarka, Gurgaon (DLF, Golf Course, Sohna Road, Sector 50+, New Gurgaon), Noida, Greater Noida West, and Faridabad.
Related guides
- Modular kitchen across Delhi NCR
- Modular kitchen in Gurgaon
- How ARITSAN works — brief to handover
- Why ARITSAN
FAQs
How long does a full home renovation take in Delhi NCR?
Most full home renovations in Delhi NCR run between 8 and 16 weeks of active work, depending on scope, civil work, and society work-hour rules. A 2BHK refresh is faster; a 3BHK with full modular kitchen, wardrobes, and bathroom work sits in the middle of that range. ARITSAN confirms the timeline in writing before work begins.
Does ARITSAN manage all vendors during a renovation?
Yes. One named project manager coordinates the carpenter, electrician, plumber, painter, modular kitchen team, wardrobe install team, window vendor, and any specialty trades. You speak to one point of accountability, not fifteen.
Can I live in the home during renovation?
It depends on scope. A single-room refresh allows the rest of the home to be lived in. A full 3BHK renovation usually requires moving out for the active civil and install phase. ARITSAN plans the phasing so disruption is minimised where possible.
How does ARITSAN handle society approvals?
Our coordinator handles the standard NOCs, lift padding, work-hour rules, material entry timing, and gate-pass paperwork most NCR societies require. You do not chase the RWA office.
What does a full home renovation include?
Scope varies by home. A typical 3BHK premium renovation includes modular kitchen, wardrobes, bathroom retrofit (where needed), electrical rework, painting, false ceiling, profile or sliding doors, window upgrade, and lighting design. ARITSAN scopes everything line-by-line in writing.
Can I renovate only part of my home?
Yes. Many ARITSAN projects are partial — a kitchen refresh, a single bedroom redesign, a balcony enclosure, or a bathroom retrofit. The coordination logic still applies even for smaller scopes.
Plan your renovation with one accountable partner.
Share your home type, scope, and how soon you want to start. ARITSAN's designers will book a free site visit and return a phased plan, a parameter band, and a written timeline within a working week.