01
Enquiry & Discovery Call
Share your requirement, room type, rough size, and budget direction. We begin by understanding whether your project is for kitchens, wardrobes, doors and windows, or a wider home upgrade.
Order Process
ARITSAN follows a clear six-step process so your project moves with structure: site understanding first, design and cost clarity second, and execution only after the scope is aligned.
How We Work
Each stage has a clear purpose — and a clear hand-off. The process is structured so that decisions happen in the right order and nothing gets rushed or guessed at.
No guesswork
Every stage is shown in sequence so you know exactly what to expect, what happens next, and when decisions need to be made — before any money changes hands.
Site-first thinking
We do not start with a catalogue. We start with your actual space, actual measurements, and a real brief before any design or cost is finalised.
Process Flow
Active Stage
01 / 06
Starting with your brief
Share your requirement, room type, rough size, and budget direction. We begin by understanding whether your project is for kitchens, wardrobes, doors and windows, or a wider home upgrade.
Requirement, location, and scope are understood before design begins.
Early clarity helps us guide the right category and budget direction.
The first conversation is about fit, not pressure.
01
Share your requirement, room type, rough size, and budget direction. We begin by understanding whether your project is for kitchens, wardrobes, doors and windows, or a wider home upgrade.
02
Our team visits your site, takes detailed measurements, studies civil conditions, and notes how you want the space to function day to day before any design is locked.
03
We convert the brief into a practical layout, finish direction, material plan, and transparent estimate so you can evaluate the design and the cost together, not separately.
04
Once you review the proposal, we refine the design, confirm scope, align timelines, and move into booking only after the solution feels right for your space and budget.
05
Approved modules, finishes, hardware, and sourced product items move into production and procurement. We coordinate drawings, manufacturing, vendor readiness, and site sequencing before dispatch.
06
The final stage covers installation, finishing checks, snag resolution, and handover. Once complete, your ARITSAN project is covered by the partner warranty terms documented for the applicable product range.
What You Can Expect
Every proposal starts from actual site conditions, not catalogue assumptions.
Design, material direction, and pricing are presented together so decisions stay grounded.
Where the chosen range carries partner warranty terms, those terms — scope, duration, conditions — are documented on the order before payment.
In Writing
A young brand earns trust by being specific. These are the checks, the payment logic, and the communication standard we hold on every project — before any money moves, and documented so you can hold us to them.
Quality Gates
Photo or video evidence at every gate, on WhatsApp, before the next stage begins.
Payments
A typical structure is shown below — your exact milestones are stated on your proposal. Final retention is released only after your snag list is closed.
Booking & design lock
Scope and design confirmed in writing before anything is ordered.
Material procurement
Collected against a confirmed order — not before.
Delivery to site
On delivery and inspection at your home.
Installation
As the on-site fitting progresses.
Handover — retention
Final retention released only after your snag list is closed.
Timeline Honesty
We quote an honest range, not a date we cannot hold. If anything moves it, that slippage is flagged in writing within 48 hours of us knowing — with the dependency that caused it named, not a vague apology.
The Change-Order Pledge
Nothing about your project changes — scope, material, or cost — without a change order you have signed. No verbal upgrades, no surprise line items at handover.
Communication
Single point of contact
One named ARITSAN coordinator owns your project end to end. You speak to one person who knows your home — not a rotating queue.
A fixed update rhythm
You get a scheduled update on a fixed rhythm — where the project stands, what happens next, and any decision we need from you.
A reply within 24 hours
We respond within 24 hours. If we miss it, you get a call explaining why — not silence.
These commitments appear inside every proposal we send. See the sample proposal format to read them in place.
The Team
Role
Translates your brief into layouts, finish direction, storage logic, and practical recommendations.
Role
Handles dimensions, condition checks, and the technical realities that keep the execution clean.
Role
Coordinates on-site fitting, finishing alignment, and handover quality before the project closes.
Quick Clarifications
The broad sequence stays the same, but the level of detailing changes by product. A kitchen, wardrobe, and doors-and-windows package will naturally involve deeper coordination than a single-room scope.
They are typically locked during the design and quote stage, before booking moves into production. That keeps costs, lead times, and expectations aligned.
Where the selected product range carries partner warranty terms, that coverage begins after successful installation and handover, subject to the final written scope, product range, and usage conditions agreed for the project.
Ready To Start?
Book a consultation and we will guide the scope, sequence, and practical next step for your project.